About

Built with React and Tailwind. Copy the prompt and paste it into Claude Code, Cursor or Lovable: your agent adds Gantt to your project and fits it to your theme.

Code

How Gantt is used: the demo's code. The component's own source comes with a free account.

Usage.tsx

import {
  ContextMenu,
  ContextMenuContent,
  ContextMenuItem,
  ContextMenuTrigger,
} from '@/components/ui/context-menu';
import {
  GanttCreateMarkerTrigger,
  GanttFeatureItem,
  GanttFeatureList,
  GanttFeatureListGroup,
  GanttHeader,
  GanttMarker,
  GanttProvider,
  GanttSidebar,
  GanttSidebarGroup,
  GanttSidebarItem,
  GanttTimeline,
  GanttToday,
} from '@/components/ui/gantt';
import { EyeIcon, LinkIcon, TrashIcon } from 'lucide-react';
import { useState } from 'react';

import {
  addMonths,
  endOfMonth,
  startOfMonth,
  subDays,
  subMonths,
} from 'date-fns';
const today = new Date();

const exampleStatuses = [
  { id: '1', name: 'Planned', color: '#6B7280' },
  { id: '2', name: 'In Progress', color: '#F59E0B' }, 
  { id: '3', name: 'Done', color: '#10B981' },
];

const exampleFeatures = [
  {
    id: '1',
    name: 'AI Scene Analysis',
    startAt: startOfMonth(subMonths(today, 6)),
    endAt: subDays(endOfMonth(today), 5),
    status: exampleStatuses[0],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '1',
      image: 'https://cdn.21st.dev/assets/mirror/54/54484be9004d64fc7ae6a2bdccc791f5f9502fbd23841ada359a8d3d7c1aedc8.svg',
      name: 'Alice Johnson',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '1', name: 'v1.0' },
  },
  {
    id: '2',
    name: 'Collaborative Editing',
    startAt: startOfMonth(subMonths(today, 5)),
    endAt: subDays(endOfMonth(today), 5),
    status: exampleStatuses[1],
    group: { id: '2', name: 'Collaboration Tools' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '2',
      image: 'https://cdn.21st.dev/assets/mirror/a2/a25e21cd9d9f92c7447a525c9e0230bcbe10d447791ebce65d6127cfb40f2698.svg',
      name: 'Bob Smith',
    },
    initiative: { id: '2', name: 'Real-time Collaboration' },
    release: { id: '1', name: 'v1.0' },
  },
  {
    id: '3',
    name: 'AI-Powered Color Grading',
    startAt: startOfMonth(subMonths(today, 4)),
    endAt: subDays(endOfMonth(today), 5),
    status: exampleStatuses[2],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '3',
      image: 'https://cdn.21st.dev/assets/mirror/97/97261900dab8e48c557cd76aba91b73bc989b48c386504341100a7b28bb9a701.svg',
      name: 'Charlie Brown',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '2', name: 'v1.1' },
  },
  {
    id: '4',
    name: 'Real-time Video Chat',
    startAt: startOfMonth(subMonths(today, 3)),
    endAt: subDays(endOfMonth(today), 12),
    status: exampleStatuses[0],
    group: { id: '2', name: 'Collaboration Tools' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '4',
      image: 'https://cdn.21st.dev/assets/mirror/60/6093366096f9348ceb484ab6f77c7eb9f2f5de67a712d9d0ce3402a2a69b0aeb.svg',
      name: 'Diana Prince',
    },
    initiative: { id: '2', name: 'Real-time Collaboration' },
    release: { id: '2', name: 'v1.1' },
  },
  {
    id: '5',
    name: 'AI Voice-to-Text Subtitles',
    startAt: startOfMonth(subMonths(today, 2)),
    endAt: subDays(endOfMonth(today), 5),
    status: exampleStatuses[1],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '5',
      image: 'https://cdn.21st.dev/assets/mirror/6c/6c654fd6db0027932893f8f274741c473490e3f2192d9b315b2a40eb7c9c3ef0.svg',
      name: 'Ethan Hunt',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '2', name: 'v1.1' },
  },
  {
    id: '6',
    name: 'Cloud Asset Management',
    startAt: startOfMonth(subMonths(today, 1)),
    endAt: endOfMonth(today),
    status: exampleStatuses[2],
    group: { id: '3', name: 'Cloud Infrastructure' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '6',
      image: 'https://cdn.21st.dev/assets/mirror/56/566957498a7dccbf0db4884dd0169b586b30210cbea1a43678491c0c9c037738.svg',
      name: 'Fiona Gallagher',
    },
    initiative: { id: '3', name: 'Cloud Migration' },
    release: { id: '3', name: 'v1.2' },
  },
  {
    id: '7',
    name: 'AI-Assisted Video Transitions',
    startAt: startOfMonth(today),
    endAt: endOfMonth(addMonths(today, 1)),
    status: exampleStatuses[0],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '7',
      image: 'https://cdn.21st.dev/assets/mirror/79/7950d84bdee32e26a7eabfa117a3f976de3d9391cfee024689ab4a6c64a43fb0.svg',
      name: 'George Lucas',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '3', name: 'v1.2' },
  },
  {
    id: '8',
    name: 'Version Control System',
    startAt: startOfMonth(addMonths(today, 1)),
    endAt: endOfMonth(addMonths(today, 2)),
    status: exampleStatuses[1],
    group: { id: '2', name: 'Collaboration Tools' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '8',
      image: 'https://cdn.21st.dev/assets/mirror/c8/c8890b07ab6c05166b29093e76604efee170144531d49cc42738329e469b14ca.svg',
      name: 'Hannah Montana',
    },
    initiative: { id: '2', name: 'Real-time Collaboration' },
    release: { id: '3', name: 'v1.2' },
  },
  {
    id: '9',
    name: 'AI Content-Aware Fill',
    startAt: startOfMonth(addMonths(today, 2)),
    endAt: endOfMonth(addMonths(today, 3)),
    status: exampleStatuses[2],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '9',
      image: 'https://cdn.21st.dev/assets/mirror/db/dbba453df3acb5955303d7a7721e68bd29dd25474e7e2fbab40667d0a8764b6d.svg',
      name: 'Ian Malcolm',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '4', name: 'v1.3' },
  },
  {
    id: '10',
    name: 'Multi-User Permissions',
    startAt: startOfMonth(addMonths(today, 3)),
    endAt: endOfMonth(addMonths(today, 4)),
    status: exampleStatuses[0],
    group: { id: '2', name: 'Collaboration Tools' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '10',
      image: 'https://cdn.21st.dev/assets/mirror/d7/d728a3a74b0be939c00e927f040a1c32715619e9e2f061ddce4396055d959b2a.svg',
      name: 'Julia Roberts',
    },
    initiative: { id: '2', name: 'Real-time Collaboration' },
    release: { id: '4', name: 'v1.3' },
  },
  {
    id: '11',
    name: 'AI-Powered Audio Enhancement',
    startAt: startOfMonth(addMonths(today, 4)),
    endAt: endOfMonth(addMonths(today, 5)),
    status: exampleStatuses[1],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '11',
      image: 'https://cdn.21st.dev/assets/mirror/07/07827dea49bbb0dee76d8f59e963431dd9576a895e6dd9d56151d55488b4ad21.svg',
      name: 'Kevin Hart',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '4', name: 'v1.3' },
  },
  {
    id: '12',
    name: 'Real-time Project Analytics',
    startAt: startOfMonth(addMonths(today, 5)),
    endAt: endOfMonth(addMonths(today, 6)),
    status: exampleStatuses[2],
    group: { id: '3', name: 'Cloud Infrastructure' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '12',
      image: 'https://cdn.21st.dev/assets/mirror/2f/2fc5d934df789da245d3cae0f882c51513b388cab0cc6754116d5a35a04122e2.svg',
      name: 'Lara Croft',
    },
    initiative: { id: '3', name: 'Cloud Migration' },
    release: { id: '5', name: 'v1.4' },
  },
  {
    id: '13',
    name: 'AI Scene Recommendations',
    startAt: startOfMonth(addMonths(today, 6)),
    endAt: endOfMonth(addMonths(today, 7)),
    status: exampleStatuses[0],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '13',
      image: 'https://cdn.21st.dev/assets/mirror/f9/f9acc66b9b42a4f3396f879d06f6ee3439f7e1b3df5a9ac0649220defe3b2a8e.svg',
      name: 'Michael Scott',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '5', name: 'v1.4' },
  },
  {
    id: '14',
    name: 'Collaborative Storyboarding',
    startAt: startOfMonth(addMonths(today, 7)),
    endAt: endOfMonth(addMonths(today, 8)),
    status: exampleStatuses[1],
    group: { id: '2', name: 'Collaboration Tools' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '14',
      image: 'https://cdn.21st.dev/assets/mirror/7f/7fbd157b0c0fbeb0b82a784d892589237a276fa946354752f6528522f474a4ae.svg',
      name: 'Natalie Portman',
    },
    initiative: { id: '2', name: 'Real-time Collaboration' },
    release: { id: '5', name: 'v1.4' },
  },
  {
    id: '15',
    name: 'AI-Driven Video Compression',
    startAt: startOfMonth(addMonths(today, 8)),
    endAt: endOfMonth(addMonths(today, 9)),
    status: exampleStatuses[2],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '15',
      image: 'https://cdn.21st.dev/assets/mirror/d5/d57fe3ed7e3cafebc3a7e99ae4c99791cc3191e7de11f08a0cfa28597b140d6c.svg',
      name: 'Oscar Isaac',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '6', name: 'v1.5' },
  },
  {
    id: '16',
    name: 'Global CDN Integration',
    startAt: startOfMonth(addMonths(today, 9)),
    endAt: endOfMonth(addMonths(today, 10)),
    status: exampleStatuses[0],
    group: { id: '3', name: 'Cloud Infrastructure' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '16',
      image: 'https://cdn.21st.dev/assets/mirror/04/04c06913139c19a4deccf50f9b03e81dcbe7db9f9c687e27bd172f4ff15933bb.svg',
      name: 'Penelope Cruz',
    },
    initiative: { id: '3', name: 'Cloud Migration' },
    release: { id: '6', name: 'v1.5' },
  },
  {
    id: '17',
    name: 'AI Object Tracking',
    startAt: startOfMonth(addMonths(today, 10)),
    endAt: endOfMonth(addMonths(today, 11)),
    status: exampleStatuses[1],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '17',
      image: 'https://cdn.21st.dev/assets/mirror/40/40dced645e851c60735549ea8d161dc363f4a07e99560590cf528e330ecdb759.svg',
      name: 'Quentin Tarantino',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '6', name: 'v1.5' },
  },
  {
    id: '18',
    name: 'Real-time Language Translation',
    startAt: startOfMonth(addMonths(today, 11)),
    endAt: endOfMonth(addMonths(today, 12)),
    status: exampleStatuses[2],
    group: { id: '2', name: 'Collaboration Tools' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '18',
      image: 'https://cdn.21st.dev/assets/mirror/45/45181d4d24c1463da2df183f4d31ba9b01e933a3a5dd3ae2f91dba03a933b4d8.svg',
      name: 'Rachel Green',
    },
    initiative: { id: '2', name: 'Real-time Collaboration' },
    release: { id: '7', name: 'v1.6' },
  },
  {
    id: '19',
    name: 'AI-Powered Video Summarization',
    startAt: startOfMonth(addMonths(today, 12)),
    endAt: endOfMonth(addMonths(today, 13)),
    status: exampleStatuses[0],
    group: { id: '1', name: 'Core AI Features' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '19',
      image: 'https://cdn.21st.dev/assets/mirror/bd/bd52b0341ad401c92dbac78e1cc3dd40e4d2e43293fb7c9709ce94757f2e04c8.svg',
      name: 'Samuel L. Jackson',
    },
    initiative: { id: '1', name: 'AI Integration' },
    release: { id: '7', name: 'v1.6' },
  },
  {
    id: '20',
    name: 'Blockchain-based Asset Licensing',
    startAt: startOfMonth(addMonths(today, 13)),
    endAt: endOfMonth(addMonths(today, 14)),
    status: exampleStatuses[1],
    group: { id: '3', name: 'Cloud Infrastructure' },
    product: { id: '1', name: 'Video Editor Pro' },
    owner: {
      id: '20',
      image: 'https://cdn.21st.dev/assets/mirror/4e/4ec3497f95745482a1d68be2980df5e5f1ccc553de1b29acdeeb342887e1140d.svg',
      name: 'Tom Hanks',
    },
    initiative: { id: '3', name: 'Cloud Migration' },
    release: { id: '7', name: 'v1.6' },
  },
];

const exampleMarkers = [
  {
    id: '1',
    date: startOfMonth(subMonths(today, 3)),
    label: 'Project Kickoff',
    className: 'bg-blue-100 text-blue-900',
  },
  {
    id: '2',
    date: subMonths(endOfMonth(today), 2),
    label: 'Phase 1 Completion',
    className: 'bg-green-100 text-green-900',
  },
  {
    id: '3',
    date: startOfMonth(addMonths(today, 3)),
    label: 'Beta Release',
    className: 'bg-purple-100 text-purple-900',
  },
  {
    id: '4',
    date: endOfMonth(addMonths(today, 6)),
    label: 'Version 1.0 Launch',
    className: 'bg-red-100 text-red-900',
  },
  {
    id: '5',
    date: startOfMonth(addMonths(today, 9)),
    label: 'User Feedback Review',
    className: 'bg-orange-100 text-orange-900',
  },
  {
    id: '6',
    date: endOfMonth(addMonths(today, 12)),
    label: 'Annual Performance Evaluation',
    className: 'bg-teal-100 text-teal-900',
  },
];

const Demo = () => {
  const [features, setFeatures] = useState(exampleFeatures);

  const groupedFeatures: Record<string, typeof features> = features.reduce<
    Record<string, typeof features>
  >((groups, feature) => {
    const groupName = feature.group.name;
    return {
        ...groups,
        [groupName]: [...(groups[groupName] || []), feature],
      };
    },
    {}
  );

  const sortedGroupedFeatures = Object.fromEntries(
    Object.entries(groupedFeatures).sort(([nameA], [nameB]) =>
      nameA.localeCompare(nameB)
    )
  );

  const handleViewFeature = (id: string) =>
    console.log(`Feature selected: ${id}`);

  const handleCopyLink = (id: string) => console.log(`Copy link: ${id}`);

  const handleRemoveFeature = (id: string) =>
    setFeatures((prev) => prev.filter((feature) => feature.id !== id));

  const handleRemoveMarker = (id: string) =>
    console.log(`Remove marker: ${id}`);

  const handleCreateMarker = (date: Date) =>
    console.log(`Create marker: ${date.toISOString()}`);

  const handleMoveFeature = (id: string, startAt: Date, endAt: Date | null) => {
    if (!endAt) {
      return;
    }

    setFeatures((prev) =>
      prev.map((feature) =>
        feature.id === id ? { ...feature, startAt, endAt } : feature
      )
    );

    console.log(`Move feature: ${id} from ${startAt} to ${endAt}`);
  };

  const handleAddFeature = (date: Date) =>
    console.log(`Add feature: ${date.toISOString()}`);

  return (
    <GanttProvider onAddItem={handleAddFeature} range="monthly" zoom={100} className="h-[500px] border">
      <GanttSidebar>
        {Object.entries(sortedGroupedFeatures).map(([group, features]) => (
          <GanttSidebarGroup key={group} name={group}>
            {features.map((feature) => (
              <GanttSidebarItem
                key={feature.id}
                feature={feature}
                onSelectItem={handleViewFeature}
              />
            ))}
          </GanttSidebarGroup>
        ))}
      </GanttSidebar>
      <GanttTimeline>
        <GanttHeader />
        <GanttFeatureList>
          {Object.entries(sortedGroupedFeatures).map(([group, features]) => (
            <GanttFeatureListGroup key={group}>
              {features.map((feature) => (
                <div className="flex" key={feature.id}>
                  <ContextMenu>
                    <ContextMenuTrigger asChild>
                      <button
                        type="button"
                        onClick={() => handleViewFeature(feature.id)}
                      >
                        <GanttFeatureItem
                          onMove={handleMoveFeature}
                          {...feature}
                        />
                      </button>
                    </ContextMenuTrigger>
                    <ContextMenuContent>
                      <ContextMenuItem
                        className="flex items-center gap-2"
                        onClick={() => handleViewFeature(feature.id)}
                      >
                        <EyeIcon size={16} className="text-muted-foreground" />
                        View feature
                      </ContextMenuItem>
                      <ContextMenuItem
                        className="flex items-center gap-2"
                        onClick={() => handleCopyLink(feature.id)}
                      >
                        <LinkIcon size={16} className="text-muted-foreground" />
                        Copy link
                      </ContextMenuItem>
                      <ContextMenuItem
                        className="flex items-center gap-2 text-destructive"
                        onClick={() => handleRemoveFeature(feature.id)}
                      >
                        <TrashIcon size={16} />
                        Remove from roadmap
                      </ContextMenuItem>
                    </ContextMenuContent>
                  </ContextMenu>
                </div>
              ))}
            </GanttFeatureListGroup>
          ))}
        </GanttFeatureList>
        {exampleMarkers.map((marker) => (
          <GanttMarker
            key={marker.id}
            {...marker}
            onRemove={handleRemoveMarker}
          />
        ))}
        <GanttToday />
        <GanttCreateMarkerTrigger onCreateMarker={handleCreateMarker} />
      </GanttTimeline>
    </GanttProvider>
  );
}
  
export default { Demo }

Dependencies

More by Hayden Bleasel

View all
  • Spinner

    Spinner

    613
  • Announcement

    Announcement

    375
  • Stories Carousel

    Stories Carousel

    335
  • Kanban

    Kanban

    206
  • Pill

    Pill

    124
  • Dropzone

    Dropzone

    112
  • Calendar

    Calendar

    112
  • Table

    Table

    94